Development Activity
Certificates of Occupancy
These documents are issued by the City of Marble Falls certifying the building's compliance with building codes and indicating it is suitable for occupancy.
View last three (3) months of issued Certificates of Occupancy.
For additional information regarding commercial projects email the Development Services Coordinator, or call 830-798-7081.
Sports Complex at Thunder Rock
Estimated Completion Date: Fall 2023
Address: 1000 Flatrock Blvd., Marble Falls, Texas 78654
Summary: Construction of a sports complex for the City of Marble Falls to provide four (4) baseball fields, four (4) soccer fields, a multipurpose field, two (2) concession buildings, and restrooms; and sidewalks will be constructed on the perimeter and within the complex to provide connectivity
Estimated Construction Value: $3,000,000
Burkes Outlet/Home Centric
Estimated Completion Date: Fall 2023
Address: 1400 FM 1431, Suite 110, Marble Falls, Texas 78654
Summary: Remodel of 35,000 square foot tenant space for Burkes Outlet and Home Centric retail space
Estimated Construction Value: $587,000
Oak Grove Apartments
Estimated Completion Date: Fall 2022
Address: 1100 Broadway, Marble Falls, Texas 78654
Summary: Construction of a multi-family development consisting of 3 buildings, playground, pavilion, and BBQ area. Total of 60 units, 20 of those units are reserved for seniors; the remaining units are 1 and 2-bedroom units.
Estimated Construction Value: $3,000,000
St. John's Catholic Church Education Building
Estimated Completion Date: Fall 2022
Address: 105 FM 1431, Marble Falls, Texas 78654
Summary: Construction of an 11,791 square foot single-story multi-purpose building. The first phase of this project includes 4 classrooms, an office, and an attached pavilion. The 5,700 square-foot pavilion will be converted into classrooms in future phases. The project includes additional parking, a detention pond, landscaping around the building and within the parking lot, and a building facade to match the existing buildings.
Estimated Construction Value: $1,600,000
Clean Storage
Estimated Completion Date: Fall 2022
Address: 706 Industrial Blvd., Marble Falls, Texas 78654
Summary: Construction of two metal storage buildings 6.300 square feet and 10,710 square feet for self-storage. These buildings are part of Phase II of the construction of the self-storage that includes 6 storage buildings. At this time only 2 buildings are being constructed. Phase I included an office and 4 storage buildings.
Estimated Construction Value: $900,000
Marble Falls Mission Center
Estimated Completion Date: Spring 2023
Address: 408 Avenue R, Marble Falls, Texas 78654
Summary: 8,207 square foot building to provide community amenities and support such as food pantry, counseling, disaster relief, office area, and other ministries; will also have a chapel area.
Estimated Construction Value: $750,000
Thunder Rock Phase I
Estimated Completion Date: Spring 2023
Address: Northwest corner of US 281 and SH 71, Marble Falls, Texas 78654
Summary: 173 acres; 298 total lots: 281 residential, 11 open space, and 6 non-residential lots; 14, 495 linear feet of new public right-of-way; sidewalks to be constructed along all streets; and the extension of 8-inch water and wastewater lines. Access to the subdivision will be through two major thoroughfares: Thunder Rock Boulevard which connects to US 281, and Centurion Parkway which will connect to Flatrock Boulevard with access to State Highway 71.
Estimated Construction Value: $15,000,000
Roper West
Estimated Completion Date: Spring 2023
Address: 1840 S US 281
Summary: Public improvements related to Phase I of the Roper West Planned Development District including the extension of FM 2147 to the west to be known as Ridge Rock Road, an extension of water and wastewater utility lines, and the construction of a detention pond to serve the development and surrounding future developments
Estimated Construction Value: $3,200,000
Capital improvement projects are public projects constructed by the city and funded with bond(s), tax, and/or utility fund revenues. These projects are to benefit the community and are publicly bid and awarded in accordance with State Law and local ordinance.
For additional information regarding capital improvement projects email the City Engineer, or call 830-798-6260.
Water Plant Expansion
Project Scope: This is the fourth and last phase of expansion of the water plant to bring the plant's treatment capacity from 2.99 million gallons per day to 4.8 million gallons per day. The project will consist of remodeling the existing 2750 square feet and adding an additional 500 square feet to the facility. This project is part of our Water and Wastewater Master Plan and will make the City's water plant capable of accommodating the rapid growth of our community and provide water for many years to come.
Budget: $3.7M
Contractor: Bryan Construction
West Innovation Loop Extension
Project Scope: Marble Falls Economic Development Corporation will construct a 1,200-foot roadway extension for West Innovation Loop located in the Business and Technology Park. The roadway extension will provide an additional 32 acres of future development for the Business and technology park. The project also includes the extension of all the required utilities to accommodate development in this area.
Budget: $750,000